This project was designed by consultant with full workshop drawings. Ivanac Mechanical worked in conjunction with the consultant and client to install Fujitsu System with multi heads all the outdoor units were located on the rooftop, all indoor units installed in bulkhead ceilings. Air conditioning was supplied in the Gaming room, all toilet exhaust systems, carpark exhaust with CO2 monitoring, MSSB and supply and install kitchen exhaust and make up air and dishwasher hoods.

